Blink DMI® in action​

See how PT Blink’s unique Blink DMI® process is transforming property asset development.

Queensland, Australia

The Fells Apartments

  • Green checkmark icon7 floors of the superstructure built in 11 days
  • Green checkmark iconTotal project time reduced from 16 to 8 months
View project
Seattle, USA

Flag Lot Apartments

  • Green checkmark iconPT Blink is engaged by the owner as the technology partner
  • Green checkmark iconDesign solution to enable use of airspace above a carpark and provide seismic stability
View project
Tasmania​, Australia

Launceston Gasworks

  • Green checkmark iconDesign to overcome heritage constraints and stability factors
View project
Commercial Building
Caboolture, Australia

Commercial Building

  • Green checkmark icon10kPa heavy duty superstructure (9.75m clear-span grid) without the need for back propping
  • Green checkmark iconOffsite manufacture including services integrated into the backbone minimised onsite trades
View project
300 George Street
Brisbane, Australia

300 George Street

  • Green checkmark iconEnabled the ground floor to continue functioning while the mezzanine was built
View project