
AI-assisted concept design overlay
Detailed design in hours not days


Design leads the integrated Blink DMITM process. Centrally coordinated, the process ensures that as-built is as-designed with the digital twin driving manufacture and integration.
This is unlike traditional building methods, where construction often commences before the design is fully resolved and complete. This can lead to design and program changes throughout the construction phase.
The Blink DMI™ method has safety built in. Safe access is designed. Safe lifting is designed. All work methodology is modelled and designed around safety. Our ecosystem partners are integrally involved in the design and implementation of safety. For each project, a safety design manual is developed the licensed engineer and signed off by all parties.
PT Blink solutions comply with relevant local and international codes throughout the world. For each project a Code Compliance document is produced for the appropriate jurisdiction and is signed off by architects, engineers and other consultants prior to manufacture.
Tag and trace technology from design through to procurement, manufacture, shipping and delivery allows real-time inventory control and just in time delivery.
Integrated building services complete with fire collars minimise site-based trade interface and increase tolerances and build quality and safety. Digital coordination allows clash resolution in the factory prior to manufacture and shipping.